Well i was up all night last night working on the zr700 and i got the clutch kit in both clutches and i got the engine totally assembled. all i have left is to switch the exhaust studs from the old cylinders to the new ones and bolt the manifolds for the d&d pipes on and then ill drop it into the sled and start hooking things up. so hopefully it'll be ready for next weekend as long as the snow lasts.